Dev Log
Aligned Bailey's nine-phase process model
What was done
- Extended the canonical phase data with rail labels, descriptive anchors, legacy aliases, stage membership and Bailey’s role.
- Added one shared
ProcessRail.astrocomponent for the BSU job-fair page and Our Process. - Reframed Our Process as the full land-development lifecycle, separating where Bailey leads, supports construction or is outside scope.
- Added explicit role labels to detailed phase articles while preserving all legacy anchors.
- Kept project-page labels unchanged by adding rail-specific display labels.
- Updated the BSU, nine-phase and production verification scripts.
- Verified the pages at 320, 390, 768, 1024 and 1280 px, tested all nine keyboard focus states and smoke-tested the first and final anchors.
Why
The former BSU strip compressed every non-led phase into a support role, which overstated Bailey’s involvement in Land Control and Vertical Development / Sale. It also duplicated phase wording outside the detailed process page. The shared model now gives recruiting, process education and future content one consistent account of Bailey’s role.
Files affected
src/data/site.tssrc/components/ProcessRail.astrosrc/pages/careers/job-fair-bsu.astrosrc/pages/dev-iq/our-process.astrosrc/scripts/verify-bsu-job-fair.mjssrc/scripts/verify-nine-phase-model.mjssrc/scripts/verify-production.mjssrc/scripts/verify-production.test.mjs.projects/0003_9_phases_bailey_fit/README.md.projects/0003_9_phases_bailey_fit/project.json.projects/0003_9_phases_bailey_fit/01-prd.md.projects/0003_9_phases_bailey_fit/02-documentation.md.projects/0003_9_phases_bailey_fit/03-testing.md.projects/0003_9_phases_bailey_fit/04-findings.md.projects/0003_9_phases_bailey_fit/implementation-plan.md
Verification
- Production build: passed, 327 pages.
- BSU verifier: passed.
- Nine-phase audit: passed across 181 active source files.
- Production-verifier tests: 5 of 5 passed.
- Responsive browser matrix and keyboard focus checks: passed.
- Browser console warnings/errors: none.
The combined npm run build:verify wrapper still requires Bash for its final repository script. Bash is not installed in this Windows session, so its build and relevant Node checks were run separately.
Intentionally deferred
- Production deployment. It requires a separate instruction from Ryan.
- Any later business-owner copy correction. Role metadata and its detailed scope sentence must change together.