Dev Log

Evaluated the nine-phase rail alignment requirements

· Codex · Bot
our-processcareersjob-fairprocessplanningqa

What was done

  • Compared the project handoff with current phase data, Our Process, the BSU job-fair page, project pages and verification scripts.
  • Confirmed the Phase 2, Phase 6 and Phase 9 role differences and unresolved Phase 1 and Phase 8 scope claims.
  • Found that the proposed data model would still duplicate titles, anchors and stage metadata.
  • Found conflicting customer-facing copy on Our Process and a lifecycle label that ends before Phase 9.
  • Reviewed the supplied desktop and phone references and added tablet-width, overflow, accessibility and stage-label checks.
  • Added production-verifier and project-page side effects that were missing from the original plan.
  • Established a clean baseline: the Astro build, BSU verifier, nine-phase audit and production-verifier tests passed. The combined build:verify command reached its final Unix-only bash step, which is unavailable in this Windows session.

Why

The visual should not merely make two pages look alike. It needs to make Bailey’s role accurate, keep detailed articles and compact rails tied to one source, and remain readable from phone through desktop without weakening existing release checks.

Files affected

  • .projects/0003_9_phases_bailey_fit/README.md
  • .projects/0003_9_phases_bailey_fit/project.json
  • .projects/0003_9_phases_bailey_fit/01-prd.md
  • .projects/0003_9_phases_bailey_fit/02-documentation.md
  • .projects/0003_9_phases_bailey_fit/implementation-plan.md
  • .projects/0003_9_phases_bailey_fit/04-findings.md
  • src/content/devlog/2026-10-29-nine-phase-rail-requirements-evaluation.md

Intentionally deferred

No page, component, canonical phase data or production verifier was changed. Implementation waits for Ryan’s role, lifecycle and display decisions and Kelli’s confirmation of the Phase 1 and Phase 8 scope language.

Feedback