Dev Log
Aligned the website with Bailey's nine-phase process
What changed
- Clarified that Bailey documents the full nine-phase land-development lifecycle while leading the professional-services phases, supporting construction, and identifying work owned by developers, contractors, and builders.
- Corrected the machine-readable homepage, contact, and
llms.txtsummaries so Phase 6 is contractor-built with Bailey support, while Phases 2 and 9 remain outside Bailey’s scope. - Updated the homepage, Services page, and Dev IQ page to distinguish the complete lifecycle from Bailey’s service scope.
- Merged the duplicate Phase 3 card on the Land Planning page so its process sequence is Phase 1, Phase 3, and Phase 8.
- Aligned the Value Engineering, Code and Comprehensive Plan Research, Overall Project Management, Agency Coordination, Water and Sewer Systems, Master-Planned Communities, and Multifamily Site Design FAQs with the canonical phase model.
- Reworded master-planned-community build-out references so they cannot be mistaken for Bailey’s numbered nine-phase process.
- Standardized Bailey civil plan-set references as
construction drawings,civil drawings, orapproved planswhere appropriate. - Added Phase 6 to the project schema for projects where Bailey supplied professional engineering support during contractor-led construction. Six construction-observation project records now include that support phase.
- Updated project pages to label the section
Bailey participation by phaseand distinguish Bailey-led work from contractor-built, Bailey-supported Phase 6 with both visible text and a dashed copper treatment. - Expanded the automated nine-phase verifier to protect the corrected scope, lifecycle summaries, project participation model, phase-card sequences, FAQ copy, build-out terminology, approved terminology exceptions, and generated output.
Why
The Our Process page had been corrected to Bailey’s approved nine-phase language, but several supporting pages still described older scope boundaries or used wording that could be confused with the numbered process. This pass carries the approved model across customer-facing, recruiting, service, FAQ, and agent-readable content so those surfaces tell the same story.
Files affected
public/index.md,public/contact.md, andpublic/llms.txt- Homepage, Services, Dev IQ, Land Planning, Civil Engineering, and selected service-detail pages
- Master-planned-community service pages
- Eight related FAQ articles
- Project content schema, project-detail template, and six construction-observation project records
src/scripts/verify-nine-phase-model.mjs.projects/0003_9_phases_bailey_fit/planning, testing, findings, and execution records
Intentional boundaries
- Landscape Architect career copy retains
construction documentsbecause that is profession-specific role language, not Bailey’s civil plan-set terminology. - Bailey does not claim to acquire or control land, act as the general contractor, or perform vertical development or sale work.
- Production deployment remains a separate approval step.
Verification
- Nine-phase audit passed across 182 active source files after a fresh production build.
- The BSU job-fair verification suite passed all checks, including the shared process rail.
- The production verifier passed all 5 test scenarios.
- The complete build verification passed all 20 checks after generating 330 Astro routes and indexing 141 pages with Pagefind.
- Responsive QA confirmed the project participation display at 1280 x 900 and 390 x 844 with no horizontal overflow. Phase 6 remained visibly distinct and text-labeled at both widths.
- An independent follow-up review found no remaining Critical or Important issues in the Phase 6 model, scope wording, project records, or verifier coverage.